Planning scheduling management
According to the data of ERP plan, make production plan
Planning scheduling management

B.I.W MES scheduling constraints and considerations


■balanced production: considering the requirements of various models yield
■offline time requirements: the emergency order priority production
■Consideration of batch, the same batch delivery vehicles lined up together
■Optimize the production sequence:

■Car body Shop: consider the same models together
■Paint shop: the same color models together to consider
■Assembly workshop: the same configuration models of order production
……

A variety of factors
Comprehensive consideration



Planning scheduling management

B.I.W MES scheduling constraints and considerations



■Obtain order
■Monitoring the execution of the order.
■Query the status of order
■Priority setting
■Adjust order 





Planning scheduling management

Graphical calendar display



■Start time
■End time
■Frequency setting
■Break time
■Starting rate
■Borrow ability




Planning scheduling management
Graphic workshop scheduling system



■Shift plan
■Process management
■设备Utilization rate of equipment


Material management

When the operator pull feeding pulled, pull the ANDON system in warehouse (warehouse large screen) will be displayed on the corresponding station material status, batching person feedingoperation according to the prompt information system. When the material is delivered tocorresponding position after system reset ANDON.




Product quality management
Product information traceability

When problems arise, can quickly find out problems of product suppliers, parts batch, , processing personnel, quality inspection staff,  confirmed by the source of the problem and the influence of the batches of products, will reduce the impact to the minimum




Product quality management

Feature rich SPC statistics




Product quality management

Feature rich SPC statistics


Product quality management

Feature rich SPC statistics 


Product quality management

Feature rich SPC statistics


Product quality management

Feature rich SPC statistics


Product quality management

Provide production data analysis , management, efficiency improvement, quality improvement and provide basic information to management.


Product quality management

Product quality management

Product quality management

The assembly line, assembly area monitoring and control




The production process management
Graphic workshop scheduling system



■In the shift of each station plugging time statistics
■In each station stop time statistics
■The statistics of each station in production
■the station to be expected time statistics


ICP No12017233-5 Tel:021-50277248 Fax:021-50277247
B.I.W Profile Site Map Downloads Careers Contact Us